Saturday, May 18, 2019

Post 9- FINALLY!!

What a winter and spring these have been. Two months of consistent rain, snow and slush beyond the normal period and we were jacked up quite high. Work remained stuck and nothing appeared to be moving!!
We received our first booking for 03 May 2019 but as on 03 April 2019, things looked dismal and weather nasty and unpredictable. We, however, had no choice and we pushed and pushed and pushed our limits. On 03 May 2019, a few hours before arrival of the first guests, we had six rooms (the first block) up and functional and what a sigh of relief it was for all of us!
Our first gang was from Mumbai- Karate students and their coach and we all had a ball of a time!
The rear lit up by a setting sun as dark clouds engulf mountains in front

Block No 1- got ready JIT

Some basic training beyond Karate

A shared happiness

Our guest with the team that made it possible

The first floor rooms

All washrooms are attached


You will see mud plaster everywhere


View from the middle floor


 Bigger rooms and best view''''...top floor

Yours truly!!


Dining area 


Views served with food


A small business meet

       While the work is in progress, we have become operational in a true military way. It was a long, hard race and all that I can say is that HE has been kind!


Thursday, March 21, 2019

Post 8- Elephant's tail

             If 2018 had an unpredictable weather profile, 2019 started with a point to prove. We have not had such a snow fall for years and snow-rain profile till now has been anything but funny. We also got a fair share of the blessings from top. As a result, the work that had been kept up despite all the hurdles, came to standstill at a time when we were almost there. Yes, it was like fabled elephant's tail getting stuck in the eye of a needle even after whole of elephant has somehow managed to pass through the same hole.

                 Despite all the logistical hurdles and unpredictable weather, we were able to push on...

 The first block had its roof readied and walls mud-plastered even while it rained around us; rainy season dragged on like never before

As the first block was getting readied and an adhoc rain harvesting contraption was put in place, the work on the upper floor of the second block began by the time it was early autumn


Upper floor of Block No 2 (two storeyed) was constructed after onset of winters

Cafe-cum-Kitchen had its roof completed despite numerous issues with voltage and huge amount spent on hiring, lugging and running a gen set


 The cottage block, constructed in a traditional wood-stone /kath-kuni way (duly modified though) took lot of time to come up. Work started on its roof after cafe roof was finished


What started as a snow shower,.....

 ......ended up as a three feet deep white cover and.....

......many times over!!

The complete main structure has a 1.5 storeyed building, a double storeyed and a three storeyed one


                    Two months of work was lost and that too at a stage when external structure was almost ready and internal work had just about begun...
One of the washrooms

The pseudo stones (tiles) in shower area

              For a casual observer, the time being taken is much on higher side. But the ground reality is that remoteness of the place means no outside labour (only five locals have been employed as labourers- by design -and none from outside- by compulsion since no one wants to walk up daily to work when work is available elsewhere too). Then one mason, one team of welders-cum-roof makers and such like skill holders and that's why all this delay.

         All the tiring effort, slogging and hard work as well as frustration gets forgotten when one climbs a flight of stairs and finds such views from windows and ventilators.........









Hanuman ji Tibba greets us on 24x7 basis